Concept map: Structural breaks and regimes
Prerequisites (two levels) and direct dependents of Structural breaks and regimes. Show everything
- 3prerequisites shown
- 0direct dependents
- 2lessons use it
Insights 16
- Plot residuals in time order even for models that are not forecasts
- Keep a fixed reference window beside a rolling one so slow drift cannot hide
- Pair a training baseline with a same-season recent window when monitoring feature drift
- Choose the drift reference window deliberately, and keep one pinned to the training data
- Classify an outlier as error, rare truth or regime change before deciding what to do with it
- Look for other events at the intervention date before attributing a break to your change
- Leave a washout gap between switchback periods when a pricing or ranking change lingers
- Test whether a difference-in-differences result survives a change of scale before reporting it
Projects 7
- Where does a steel plant's electricity cost exposure concentrate? Load and power-factor profile
- Flagship: final bookings per departure from booking-curve snapshots
- Route-day passenger backtest and the capacity/price what-if: forecasts are not causal answers
- Intermittent weekly demand for a gift-ware wholesaler: beating the zero forecast honestly
- Coherent store, department and item forecasts with hierarchical reconciliation
- Day-ahead quarter-hour load with daily, weekly and annual seasonality
List view151 concepts
Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
Day 7
Day 8
Day 9
Day 11
Day 12
Day 13
Day 14
Day 15
Day 16
Day 17
Day 18
Day 19
Day 21
Day 22
Day 23
Day 24
Day 25
Day 26
Day 27
Day 28
Day 29
Day 31
Day 32
Day 33
Day 34
Day 35
Day 36
Day 37
Day 38
Day 39
Day 40
Day 41
Day 42
Day 43
Day 44
Day 45
Day 46
Day 47
Day 48
Day 49
Day 51
Day 52
Day 53
Day 54
Day 55
Day 58
Day 59
Day 60