Score lead-time demand as a cumulative quantity when the decision covers the whole lead time

Evidence type
practitioner heuristic
Difficulty
medium
Roles
Data scientist, Data analyst
Industries
retail, logistics, aviation

Summary: situation, action, reason, boundary

  1. Situation

    A replenishment or seat-allocation decision commits stock for the next four days; the team reports daily MAPE for horizons 1 to 4.

  2. Action

    Sum forecasts and actuals over the lead time at each origin and score that cumulative error with the metric and quantile the decision uses. Report the daily profile separately for diagnosis.

  3. Reason

    The decision responds to total demand over the exposure window. Signed errors on adjacent days partly cancel (and may be correlated), so the cumulative error has its own size and distribution.

  4. Boundary

    Inventory, crew and capacity decisions with a lead time or review period longer than one step.

Symptom or risk

Daily error says little about the cumulative shortfall that causes stock-outs, and the daily numbers look worse than the decision-relevant ones when errors partly cancel.

Exceptions

If each step triggers its own irrevocable decision, per-step error is the right level.

Trade-offs

Cumulative scoring hides which day was wrong; keep both views.

Pitfalls

Summing per-step quantiles to get a cumulative quantile (see the insight on quantile sums).

Example

Hypothetical: independent daily errors with sd 10 on daily demand of 100 give 8% mean absolute percentage error, while the four-day total (sd 20 on 400) gives 4%.

Lessons and concepts